Control at the connection point
For containers and multi-container sites. The EMS holds the site to its grid connection limits, runs the safety chain, and executes the quarter-hourly schedule the market layer sends it — with or without a live link.
Site control, then market delivery
Layer 1 and layer 2 for a utility-scale asset, with a defined hand-off to Qilin QUANT.
Device control
Modbus, CAN and MQTT to the BMS and PCS of every container, with the safety interlocks and the SCADA state view.
Connection point management
Active and reactive power held inside the limits agreed with the operator, per container and for the site as a whole.
Grid service delivery
aFRR and mFRR set points executed at site level, with the response logged for verification.
Safety chain
Interlocks, alarm handling and a defined fallback mode if the link to the market layer is lost.
Schedule execution
The 15-minute schedule from Qilin QUANT, executed and reconciled against what the site actually delivered.
EU data residency
All operational data on servers in the EU, GDPR-compliant by design.
What the operator sees
Screens from a site that is running today — a 2.75 MWh installation on the European grid. The customer's name is masked; nothing else is.

The site panel — running days, installed capacity and power, the alarm list, a photograph of the containers themselves, daily charge and discharge, the revenue target and live state of charge

Multi-site overview — a real week, including a day the market moved against us. We publish it that way because that is what operating actually looks like.

BMS monitor — down to which rack and which cell is hottest, and how much charge and discharge energy is available right now

The control cabinet is ours too
Patch panels and network switches, the coordinated control units, the engineering workstation, the servers and the UPS — specified, built and commissioned as one cabinet, so the site is not a collection of parts from four vendors that have never met.

Run Monitor — every data family the pipeline tracks, live, with success and failure counts
Start your own project
Tell us about your project and we'll size a system and reply within two business days.