A mobile crane lifting a wrapped CROSTORION battery container from the low-loader at Bulinac
Home/References/Bulinac 5 MW / 10 MWh
Installed

5 MW / 10 MWh beside a solar plant

Renewables · Bulinac, Bjelovar-Bilogora · Containers set September 2026

Capacity10 MWhContainerised
Power5 MWGrid-side
Delivered09 / 2026Under abnormal transport
SiteSolar plantStorage added to generation
What was built

Ten megawatt-hours, delivered down a field track

A containerised battery system of 5 MW and 10 MWh, set on prepared foundations beside an operating solar plant — so the generation already on the site has somewhere to go when the connection cannot take it.

The containers arrived on low-loaders under abnormal-transport escort, along a track between the maize and the panel rows. Two mobile cranes lifted each one off the trailer and set it on cast concrete plinths in a single working day.

The photographs on this page are ours, dated, and taken on site. The delivery shot carries its own GPS stamp — 2 September 2026, 45.82 N 16.96 E — because a project record nobody can check is not a record.

A mobile crane lowering a wrapped CROSTORION battery container onto its concrete foundation beside the solar array at Bulinac
On the plinth

Doors open, racks in

The moment the wrapping comes off. Each container is set down, levelled, and opened for the incoming inspection before anything is energised.

Inside: racked battery modules on liquid cooling, the busbars that tie them together, and the aisle an engineer needs to reach any one of them. Nothing on this page is a render.

A CROSTORION battery container at Bulinac with its doors open
Bulinac — container in place, doors open for the incoming inspection
From the site

Delivery day, start to finish

Low-loader to plinth, photographed as it happened.